This project consisted of the construction of of new office space and service area, including the renovation of existing office space. The Embassy was able to conduct full scale operations while this renovation took place. This was not a problem as all of the Posts that Cosmopolitan has worked in were fully operational during construction.
Specific changes made to the original structure was the addition of a 310 square meter office space and service area, which included the ambassador's garage. About 380 square meters of existing office space was renovated as well. A new control access area facility was installed to improve functions related to security.
Although the embassy's full scale operations were taking place, the renovations could still take place, beginning in December or 1994 and being completely finished by September 1995.