This project required Cosmopolitan to conduct site work excavation, grading, demolition of existing ridges and hills to level an area for the designated airfield. This airfield was successfully built soon after Cosmopolitan set the framework on site. After the landscaping portion was completed, Cosmo also installed a large area of fence. Throughout an existing storm, Cyclone Phet, the project was carried throughout it's course and was completed with no issues.
It was begun in November, 2009 and completed June, 2010.